Umeå project with movable floor and vertical bulkhead
In Umea in Sweden Variopool has completed a project! This projects contains a lot of products which ensures the swimming…
Umeå project with movable floor and vertical bulkhead
In Umea in Sweden Variopool has completed a project! This projects contains a lot of products which ensures the swimming…
Sjöbo Simanläggning with Swiss Timing equipment
Sjöb Simanläggning is recently equipt with Swiss Timing OSB-11 starting blocks. Now they are ready for competitions and Championships. Also…
Munktellbadet – Eskilstuna
Project in Eskilstuna, Sweden is completed! A project with a lot of installed products of Variopool. In the competition swimming…
Högevallsbadet – Lund
The swimming pool in Lund has for many years (just over 20) a display delivered from IC Control. It is…
Bodö – Norge
Omega OSB14 starting blocks. It fits the narrow pool edge. 2015 Bodö, Norge Bodin simhallen Renovering Pooltech Produkter Omega OSB14…
Aq-Va-Kul – Malmö
Starting block platform mounted on existing starting block. The delivery includes Omega OSB12 lid with RDB – ie electronic timing…
Project at Scheldebad completed by Varioplay
Waterslide, water toys, and benches for Scheldebad at Temse, Belgium In June 2018, a project was completed in Temse, Belgium.…
Hart van Zuid, Rotterdam, the Netherlands
The project Hart van Zuid Together with Ballast Nedam, we are working on the project named ‘Hart van Zuid’ in…
Waterslide, Den Helder, the Netherlands
The waterslide project Den Helder The swimming pool in the city Den Helder in the north of the Netherlands uses…
Swimming pool Vianen, the Netherlands
The swimming pool Vianen, the Netherlands There is installed a waterslide by Varioplay in the swimming pool in Helsdingen, Vianen. The…
Swimming pool De Molenkoog, Texel, the Netherlands
The Island project Our team worked very hard on the outdoor swimming pool de Molenkoog in Den Burg at the…