Högevallsbadet – Lund
The swimming pool in Lund has for many years (just over 20) a display delivered from IC Control. It is an alpha numeric display that in connection with the rebuilding of 2012, had to spend twelve months outside the building, but after preparation of the swimming pool hall – again ended up on the wall.
A cumbersome and rather consoling procedure for the users. We got the pleasure of delivering a full video display with 6.93 mm distance between the pixels and adapted for swimming pool use. Also included were water polo taking, hardware and software, and underwater cameras.
In the pictures you see a little of the assembly that was done in February 2016.