Sjöbo Simanläggning with Swiss Timing equipment
Sjöb Simanläggning is recently equipt with Swiss Timing OSB-11 starting blocks. Now they are ready for competitions and Championships. Also new racing lines with the Antiwave system and 5-step stairs.
2016
Sjöbo
New swimming pool
Liljewalls Ark. drawn
NCC built
Products installed:
- Display 2 x 1 meter
- Complete timing equipment
- Swiss Timing start pallets
- Racing Lanes
- Stainless steel basin equipment such as linings, railings, thief start-back pillars, ladders
- Trainingsclock